- Each Chamber is equippted with an independent engine block consisting of 3 heating generators and 3 convection blowers.
- The control box is designed separately from the cabinet for the purpose of install outside the drying room, allowing the user to remotely control. Each controller use for each chamber is assembled in the same control box.
- Forced-heating, hot air flows are continuously circulating by convection blowers.
- Control temperature & time through PID Integrated Microprocessor Controller, with high precision.
Exhaust fans system for exhausting moist air in each chamber.
- Display pre-set parameters, dry parameters & alarms on the LED panel.
- Timer function.
- Equipped with PT100 sensor for temperature measurement.
- Chart to describe the process of the operation (T1 – Time delay, T2 – Heating, T3 – Drying cycle, T4 – Cooling, T5 – Finish).
The Cabinet is constructed with exterior shell and interior shell of stainless steel SUS 304.